J & I Industries services and products endeavors right from the initial stage of selection and purchase of raw materials to the final stage of after Sales & Services, to excel in all spheres of its activities, Quest for top grade quality is perpetual for excellence in all that is produced.
When you team up with J & I, you are certain to get solutions that are more economical and cost effective. We provide excellent service with minimum possible lead time at a very comparative price. We have gained enough reputation and confidence from our service and achieved considerable vide experience in this field.
J & I’s strategic quality plan can also be critical to successful completion of job within the predetermined time limit. J & I believes in total quality systems. We strictly follow the standards – DIN, BS, ASME, ANSI, API, IS. We believe that the service provided to the customer can be of the first quality only when the procedure laid then by the company is strictly followed at all the stages from the beginning.
Our Products are manufactured in good quality environment and all our products are geniune in terms of quality and durability. |
| Quality Policy |
J & I believes in total quality systems. We strictly follow the standards – BS, ASME, API. We believe that the service provided to the customer can be of the first quality only when the procedure laid then by the company is strictly followed at all the stages from the beginning.
We have quality skilled and experienced manpower for erection and fabrication of jobs specified as above, our strength is given below Skilled Qualified Engineers, Q.C. Engineers, Erection Engineers, Site Supervisors, Welder (TIG / MIG / ARC)Grinders, Riggers, Gas Cutters, Fitters, Gougers. |
| Quality System Commitment |
The quality system that we adhere at the following stages:
1. Welders qualification. All welders are given the nos. like W3, W4, etc. A separate register is maintained for WPS & PQR. Both WPS & PQR are prepared in the printed format & after the successful qualification these records are endorsed by the third party inspector. A separate file is maintained for these records.
2.Stage-wise inspection. The in-process stages like set-ups, back chips, fit-ups etc are recorded with all the observations in the stage-wise inspection report book before offering the same to the third inspector.
3.Radiography. A radiography sketch of the equipment giving details of all the weld joints is prepared in advance & after the radiography is taken they are marked in the sketch. The radiography technique, the source strength, the film details and the joint details. After the films are viewed the remarks are entered & then offered fir the third party inspector for his review.
4. Dimensional inspection. When the equipment is completed in all aspects before hydro test the final dimensions are checked & noted on the drawing as well as a report is prepared. Any major deviation observed are corrected, if not possible, conveyed to the client/consultant for their approval.
5. Hydro test. Hydro test is carried out on the equipment after all the clearances are obtained for NDT, dimensional, materials etc. The equipment is positioned in such way so that no airlock is created. Two pressure gauges are used which are calibrated. All the weld joints as well as the joints are thoroughly cleaned. Holding time is minimum of 30 minutes. A separate Inspection report is prepared & enclosed by the third party Inspector.
6. Final Documentations.
We provide the BANK GUARANTEE OF THE SERVICES we offer. We have gained enough reputation and confidence from our service and achieved considerable vide experience in this field. J & I’s strategic quality plan can also be critical to successful completion of job within the predetermined time limit. |
|